Pilot2012
Measurement Specification
- SCHEDULE
- Start date: 10/September/2012
- End date: 14/September/2012 (but we can do +1 week if everybody agrees)
- MEASUREMENT
- Integration time: 1-minute, but we have space in the FTP for groups measuring with higher time resolution.
- Period: from 8am to 8pm because most Lidar groups cannot leave their systems unattended.
- DATA
- ASCII is the preferred format as everyone can easily read and write. However, binary format (e.g. Licel) are ok if the group provides the appropriate routines for reading and writing.
- Will be stored in our FTP server, a folder for each group, with sub-folders for:
- Original raw data (if group wants to share that)
- 1-min raw data
- Processed 1-min raw data