Pilot2012

Measurement Specification

  • SCHEDULE
    • Start date: 10/September/2012
    • End date: 14/September/2012 (but we can do +1 week if everybody agrees)
  • MEASUREMENT
    • Integration time: 1-minute, but we have space in the FTP for groups measuring with higher time resolution.
    • Period: from 8am to 8pm because most Lidar groups cannot leave their systems unattended.
  • DATA
    • ASCII is the preferred format as everyone can easily read and write. However, binary format (e.g. Licel) are ok if the group provides the appropriate routines for reading and writing.
    • Will be stored in our FTP server, a folder for each group, with sub-folders for:
      • Original raw data (if group wants to share that)
      • 1-min raw data
      • Processed 1-min raw data